Spring has sprung in Springtown. Last weekend Daniel and I decided we would dig the probes under the walls to see how deep the foundations are. We need this for the drawings and rather than ask Ken and Henry (the builders of the story) to do it, we decided we could wield the spades ourselves. We dug three exploratory probes at the base of the stone walls and each time we hit a small ledge of concrete. This concrete was very roughly poured and broke up easily. The base of the stone walls was about 6 inches below this concrete and not far below the level of the existing basement. The foundation stones at the base of the wall look like very big stones - must have taken quite an effort to get them all there. To our horror, when we returned to these holes this weekend they had all filled up with water. Not from the basement but from the ground below. Spring seems to have bought springs with it that spring up everywhere (our basement included) - no wonder they called it Springto...
The Story of DeJoux House, 374 Springtown Road, New Paltz, NY. (A first generation American farmhouse)